Flat Rock Creek improvement project

The City is seeking to naturalise and improve Flat Rock Creek through the development of the Flat Rock Creek Improvement Project. The objectives of this project are to identify and implement the best options to realise benefits including:

Click to enlarge

An image of Flat Rock Creek showing build up of sediment and vegetation
An image showing the flow of Flat Rock Creek over the beach to the ocean
An image of vegetation around Flat Rock Creek
 

Flat Rock Creek is currently in poor condition, with large amounts of sediment deposited in the lakes and lagoons which have contributed to poor water quality. Sediment transport within catchments is a natural process, however the dynamics within the catchment have been highly altered resulting in increased sedimentation in some areas and decreases in others. The lakes and lagoons are currently filling with sediment and without intervention will continue to do so. Ongoing sediment accumulation will reach a point where it might increase flood impacts.

As with all urbanised catchments, the hydrology has also been severely impacted. Several detrimental geomorphic processes are evident within the catchment. Most of these are associated with natural stream processes, exacerbated by variations in discharge, land use and low density or absent riparian vegetation.

The existing multi-cell culverts in Teemangum Street have been condition assessed and need to be replaced. The City will replace the multi-cell culverts with a single span bridge structure. This will improve the hydraulic conveyance in the lower reach of this catchment and assist with future naturalisation of Flat Rock Creek. Construction works are scheduled to commence in July 2021 with an anticipated completion date to be December 2021. Further updates will be provided closer to the commencement date.

Improvement project progress

In 2018 the City engaged a consultant to identify options to improve Flat Rock Creek, focussing on water quality, ecological health, aesthetics and flood mitigation potential. This involved community and stakeholder engagement, development of conceptual options and identification of the next steps to progress the project.

Community and stakeholder consultation included:

  • two public community meetings
  • pop up tent on site in Len Wort Park to gauge community views
  • a stall for community consultation and information at the Currumbin night markets on two occasions
  • consultation and liaison with traditional owners
  • engaging with community groups including Tugun Progress Association, Friends of Currumbin, Disabled Surfers Association, Gecko, Tugun Girl Guides, Watergum, Surfrider Foundation and
  • consultation and negotiation with the Currumbin Wildlife Sanctuary.

Improvement project future steps

The Flat Rock Creek Improvement Project is a long-term plan for improving Flat Rock Creek. The Project, which must take into account the views and needs of the community and other stakeholders, is likely to be implemented in stages over a number of years.

The options analysis, which included extensive consultation with the community and other stakeholders, has now been completed. The next steps in the project include developing a business case and determining the priority actions and the timeline for implementation.

Further updates on this project will be provided in due course.